Casella To Re-Submit Permit Applications Mid-2023!

Please Help Us Save Forest Lake

SaveForestLake@yahoo.com 603-991-2078

SaveForestLake@yahoo.com 603-991-2078

  • Home
  • File Page
  • A 2nd File Page
  • Landfill Maps & Drawings
  • Wetlands Permit App Info
  • The Water Flow Pictorial
  • More Files and Docs
  • Videos
  • More
    • Home
    • File Page
    • A 2nd File Page
    • Landfill Maps & Drawings
    • Wetlands Permit App Info
    • The Water Flow Pictorial
    • More Files and Docs
    • Videos
  • Home
  • File Page
  • A 2nd File Page
  • Landfill Maps & Drawings
  • Wetlands Permit App Info
  • The Water Flow Pictorial
  • More Files and Docs
  • Videos
Save Forest Lake

Please Help Us Save Forest Lake!

Please Help Us Save Forest Lake!Please Help Us Save Forest Lake!

 

Cal-Record:  NH House Passes Landfill-Groundwater Siting Bill


Boston Globe: The big stink: How a proposed landfill is roiling a tiny New Hampshire town
Concord Monitor: Proposed landfill in tiny North Country town raises environmental justice concerns

Buckle Up! 2023 Is Going To Be A BIG Year!

New Casella Permit Apps Expected Mid-2023, HB1454 Re-Submitted, Could Casella Be Homeless In NH?

Blog Post About Next Round Of Casella 2023 Permitting Applications:    

Casella "Concept 5" Is A Lie Meant To Get A Foot In The Door


3/17/2023 NHPR:

Dalton voters reject efforts to abolish boards, but landfill division continues


3/17/2023 Concord Monitor:

Dalton’s concerns over landfill safety surface in DES's public input session 


3/15/2023 Union Leader Article: 

Developer says Dalton landfill plans still on despite setback from voters 


3/15/2023 Cal-Rec Article: 

Dalton Planning Board, Conservation Commission Survive Town Vote


Is Maine The Next East Palestine Disaster?  

Casella Sludge "Crisis" Poses A significant Environmental Threat


2/26/2023 Cal-Rec Article: 

Injunction Seeks To Stop Elimination Of Conservation Commission, Planning Board


2/22/2023 Cal-Rec Article:   

North Country:  Landfill Siting Bills Go To Hearing As Casella Expresses Doubts About Dalton


Cal-Rec Letter:   

Stop This Environmental Disaster


 Feb 3, 2023 Cal-Rec Story:

Opponents Of Abolishing Planning Board Outweigh Supporters At Dalton Public Hearing


Feb 2, 2023 Dalton Planning Board Abolishment Public Hearing Video:

Click Here


Jan 30, 2023 Cal-Rec Story:   

Dalton Petitioned Articles Seek To Abolish Planning Board, Conservation Commission


Jan 4, 2023:  In the news:  

North Country Reps Sponsor Landfill Siting, Solid Waste-Related Legislation


Op-Ed: An Update On The Fight To Save Forest Lake (And New Hampshire)


Permitting Round 2 Begins

Casella Meeting With NHDES Solid Waste Officials, Nov 18, 2022:  Meeting Notes

Casella Meeting With NHDES Wetlands, US Army Corps, EPA:  Meeting Agenda


As you can read, Casella and NHDES are now attempting to game the permitting process, by trying to sell the public on a lie.  We know what Casella intends to build at this site, based on the initial round of permit applications, since withdrawn.  Now they intend to submit a permit application in mid-2023, drastically reducing the size of the landfill footprint and thus, wetlands impacts, in order to gain permit approvals at the behest of NHDES officials.  Once they are in, they are in, and they have nearly 1900 acres of land under contract.  Note that the VOLUME of waste sought for yearly permitted capacity is exactly the same as Round 1, which is double what their neighboring NCES Landfill took in waste in 2021:  227k tons vs 465k tons for GSL.  18 year permitted life?  Yeah, right.  This company is all about expansion.  While NHDES will try and tell us that they can only weigh the merits of what is submitted to them, we must hold them to the true intent behind this next round of permitting applications, and the true environmental impacts and scope of this project.  Otherwise, how on earth can they justify SACRIFICING Forest Lake and the surrounding environment for an 18-year landfill?   That is simply not a good deal for New Hampshire and the North Country.  Besides, the new NH State Solid Waste Plan seeks a REDUCTION of the waste stream of 25% by 2030.  The NH 2020-2021 Solid Waste Biennial Report confirms that there is NO CAPACITY SHORTFALL for New Hampshire until 2034, and by then, the Waste Management Turnkey Landfill will have submitted expansion plans for that facility, and the AVRRDD Mt. Carberry is permitted to 2041, with Phase IIIB expansion plans pushing that facility's permitted life out to 2049.  We simply do not need, nor want, this dangerous landfill development next to Forest Lake and the State Park.  #SaveForestLake


New 2020-2021 NH Solid Waste Biennial Report:  Click Here

See the graph and information on pages 6-9, relative to NH landfill capacity.  There is no "shortfall" until at least 2034, despite what Casella tries to sell elected officials and the public!


NH 2022 State Solid Waste Plan:  Click Here

The new state solid waste plan, updated for the first time since 2003, has established new waste reduction goals.  According to the plan, page 6, the goals seek to reduce the disposal of municipal solid waste (MSW) and construction and demolition debris (C&D) by 25% by 2030 and by 45% by 2050

We're not sure how permitting a new, commercial landfill, which seeks permitting for TWICE the 2021 waste intake at Casella's NCES Landfill in Bethlehem, NH, will help the state meet its diversion goals.


The Conservation Law Foundation's appeal of the Casella NCES Stage VI Expansion reaches the NH State Supreme Court, December 5, 2022 filings:

NHDES Rule 10 Appeal Filing

Casella Final Notice of Appeal Filing

NH Does Not Have A Capacity Crisis, Casella Does!

False Narrative About A Capacity Crisis Proven Wrong

The above chart is from page 6 of the recently-released 2020-2021 NHDES Biennial Solid waste Report.  As you can see, this chart confirms what we have been saying all along, that New Hampshire does NOT have a landfill capacity problem, with no anticipated capacity shortfall occurring until at least 2034, even with the closure of Casella's NCES Landfill by 2026 (or sooner).  


NH has PLENTY of capacity, especially for NH-generated waste.  New Hampshire does have an "out-of-state" waste problem, particularly with commercial operators with "unlimited service area" permits, allowing for importing waste into New Hampshire .


The continued use of a false narrative, using the outdated 2019 legislative report, which does not take into consideration the permitted/pending expansions, simply highlights the reliance on deceptive messaging by the waste industry to promote the outdated practice of landfilling in order to further the continued exploitation of NH for the financial interests of the waste industry, and in particular, Casella.  Casella wants another landfill in NH so as to continue the lucrative practice of importing out-of-state waste into our borders.  


Simply put, NH does NOT need a new landfill, Casella does!


Link to 2020-2021 NHDES Biennial Report:  Click Here For PDF

"Override The Veto" Effort FAILS by 5 NH Senate Votes

HB1454 Would Have Updated Setback Protections, Governor Sununu Vetoed It!

 

Landfill Setback Legislation Re-filed Day After Veto Override Failed in N.H. Senate  


Governor Sununu Lies About HB1454, Supports Casella's Forest Lake Landfill Project, 11/1/22  WMUR Gubernatorial Debate:  Video, Click Here


September 15 Rally/House & Senate Vote Video:  https://youtu.be/-WVb82mJW4k

(78% of votes cast  overall were in FAVOR of the veto override)

256-65 in House, 11-12 in Senate


Union Leader:  NH State Senate Bails Sununu Out Over Landfill Siting


Video Invite:  Join Us On September 15th, 10:45AM in Concord on Veto Override Day


8/16/22 Letter from the Town of Dalton Conservation Commission to NH House and Senate:

Support The HB1454 Veto Override


7/25/22  NH Bulletin Op-Ed:   

Would legislation make it ‘virtually impossible’ to site a landfill in New Hampshire?    NO!!


WMUR News Report, Video:  Governor vetoes bill to tighten permitting rules for new landfills

Cal-Rec:  Governor Vetoes Landfill Groundwater Bill

NHPR:  Sununu Vetoes Bill That Would Have Created New Rules for Siting Landfills



Manchester Union Leader Editorial:  Landfill issue: Details, Gov., details

Letter to editor, Union Leader:  Governor Sununu Has An Opportunity To Protect NH's Water


May 10, 2022 news report from WMUR on HB1454, Sununu sides with Casella:   https://www.wmur.com/article/lawmakers-activists-governor-landfill-new-hampshire-51022/39959214


Casella & Free Staters Deceive Dalton Voters Into Surrendering Local Land Use Control

InDepthNH:  Dalton Voters Defeat Permanent Zoning 

Video Revealing Casella Deception of Dalton:  https://youtu.be/73EeiwwdU2E


As predicted below, Casella WITHDRAWS ALL remaining landfill permit applications!

May 31, 2022 Casella Solid Waste Permit Application Withdrawal Letter

6/3/22 News Report From NHPR:  Casella withdraws permit applications for Dalton landfill

6/1/22 Casella Withdraws Landfill Permit For Dalton:  Caledonian-Record

6/1/22 GSL Withdraws Permit Applications For Dalton Landfill:  InDepth NH


May 12, 2022 Letter From NHDES To Casella:  June 1, 2022 DEADLINE Approaching

Will Casella WITHDRAW Solid Waste Permit Application?  Possibly, As Denial Looms!


HB1454 Passage (May 5, 2022) In The News:

InDepthNH:  Landfill Restrictions Pass Senate, Soucy Says She Was Bullied

Caledonian-Record:  Landfill Setback Bill Passes N.H. Senate Following Compromise

NH Bulletin:  Senate passes landfill buffer zone legislation

NHPR:  The latest on environment and energy bills in the New Hampshire legislature 

Union Leader:  Senate approves tougher bill for new landfill sites

WMUR Evening News clip (5/5/22)

WMUR Morning News clip (5/6/22)

5/10 WMUR 5 o'clock news report on HB1454 and rebuttal of Governor Sununu comments of 5/5


Video of Senate floor vote to approve HB1454 (May 5, 2022)


On April 21, HB1454 was "Special Ordered" on the floor of the NH State Senate for May 5, 10:00AM.  NH Republican Senators have the opportunity to save the day for HB1454, in the best interests of the people of New Hampshire and our environment!  GOP Majority Leader Jeb Bradley, during that April 21st Senate session stated on the floor that he was going to reach out to Senator Watters and Senator Perkins-Kwoka to find a resolution.  He also stated that he felt that finding a resolution to this important bill would be 'for the betterment of New Hampshire".  



Senate Energy & Natural Resources Committee "Executive Session" in which the committee votes 3-1 to ITL HB1454.  Senator Kevin Avard stated that "I don't like this one" and "moves the goalposts midstream".  Shameful how the private waste industry seemingly has him under their thumb.  Cued video link


Senate Energy & Natural Resources Committee Hearing  On HB1454

Video of 4/5/22 Senate E&NR Hearing For HB1454:  Link 


HB1454 Lawsuit Threat:    Casella Aims To Open Dalton Landfill, With Lawsuit If Necessary


Video:  HB1454 PASSED In The House (3/16/22)  Video Link

Please urge your State Senator to SUPPORT HB1454!  Senate Contact Info


Video:  Casella Attorney ADMITS Dalton Landfill Site Would Not Meet Setback Standards Under HB1454!  Video Link


NH Bulletin (3/4/22):  House committee narrowly recommends advancing landfill siting bill


Video, links below, from the March 1, 2022 NH House E&A Committee vote on HB1454.   Some fantastic, passionate discussion amongst the committee members as to why this bill is so important.  HB1454 came out of committee 10-9 as OTPA!  On to the House floor!


Cued to 14:54, when the House E&A subcommittee final work session & vote of subcommittee on HB1454:  https://youtu.be/nKxiFgMPr5E?t=894 


Cued to 57:35, when the entire House E&A committee meets on HB1454 with the executive session to follow, with it coming out of committee as OTPA (Ought To Pass as Amended) 10-9:   https://youtu.be/nKxiFgMPr5E


Linked below is an EXCELLENT letter in the Union Leader, relative to HB1454

 Science Matters siting Landfills


Capacity Crisis?  What Capacity Crisis?  NHDES Director Mike Wimsatt Confirms Existing Landfills Expanding, Debunks Casella "Capacity Shortfall" Misinformation Campaign:  Click Here For Video


Casella Admits Will "Backfill" NH Waste Diversion With Out-Of-State Trash!  Click Here For Video 


Cued video of the January 18, 2022 NH House E&A public hearing testimony on HB1454:  https://youtu.be/2ef68aCI3bM?t=14706

There were a lot of blue shirts at the "Override The Veto" Rally at the State Capitol in Concord!

Map of Alder Brook & Hatch Brook "catchment" area and surrounding wetlands/streams surrounding site

CASELLA WITHDRAWS DESTRUCTIVE WETLANDS PERMIT APPLICATION

5 Years Of Work Down The Drain For Casella

Remember Bluto Blutarsky's infamous quote from the movie,  Animal House?  

"7 Years of college, down the drain"  


Seems Casella is in the same boat and should be able to relate.  Their "expert engineers" have been hard at work on this project for over 3 years now, only to withdraw their permit application, following the NHDES request for an "amended" permit application back in September...


So much for "state of the art", as Casella's engineering expertise and operational abilities continue to be questioned during this permitting fiasco.  As we've stated from the beginning, this is a terrible location for such an industrial development, and as the map above highlights, it is surrounded by wetlands that feed into the Ammonoosuc River.  Simply put, Casella is in over its head on this project and NHDES seems to know that.  The question is, why are they trying to help Casella save face, as opposed to just telling them that this project is simply not going to fly?


Some Important Info From The NH Solid Waste Working Group:


NH Solid Waste Working Group Chairwoman and NH State Rep Karen Ebel's honest, substantive and very nuanced testimony (February 2, 2022) on NH solid waste woes, cued to 41:21 and ends at 59:20

A MUST WATCH:  https://youtu.be/W0KIdWiojl4?t=2481   


Please, be sure to catch her closing comments relative to the NH Attorney General's 2021 opinion on the Interstate Commerce Clause at 56:45 AND 57:24, her observations about NH's reliance on private landfills and out-of-state waste!!  Does NH really want to curb the influx of out-of-state trash into our borders?  NH Attorney General's opinion on the ICC supports a future STATE-OWNED LANDFILL!


In the News:

 Casella Pulls Dalton Wetlands Permit Application 


 Permit application for Dalton landfill withdrawn -- for now 

 

Casella withdraws wetlands permit application, plans to resubmit next year 


Casella Withdraws Dalton Wetlands Application


Casella's Misinformation Campaign


Blog Post: 

Krampus Visits Casella


Documents:

Casella Withdrawal Letter, December 10, 2021

NHDES Acknowledgment of Withdrawal Letter, December 13, 2021


Join Us!

TOGETHER, WE can stop this dangerously-irresponsible project.  Send an email to:

SaveForestLake@yahoo.com to be added to our mailing list for the latest updates!

#SaveForestLake 


Email Us

NHDES Seeks Amended Permit App & Circumvents The Law

Video of 5-Hour NHDES "Public Info" Session Reveals Permitting Chaos

While a separate matter, the NH Waste Management Council has deemed that NHDES acted unlawfully in permitting the Stage VI NCES Landfill expansion in CLF appeal decision:

CLF Prevails on Critical Issue in Bethlehem Landfill Appeal MAY 12, 2022

May 11, 2022 WMC Doc


Collusion between NHDES (the state's permitting agency) and the landfill developer, Casella?  Optics have been very bad so far, with NHDES even consulting with the NH Attorney General!

NH Attorney General Formella 9/3/21 Email To SFL  (since when does the state AG email little old us?)


"Amended" Wetlands Permit Application Agreement B/W Casella and NHDES (Dec 15, 2021 Deadline)


Video from NHDES of 5-hour long "information session":  YouTube Link 

 

Proposed Landfill Most Complicated Permitting Process Ever For DES: Link


**be sure to check our file pages for the latest documents!**


Have you signed our "Save Forest Lake online petition?  LINK To Petition


September 25, 2021 Cal-Rec Article:   Group Pushes State To Re-Include Full Wetlands Impact Of Landfill


Some of the latest letters and news reports:

InDepthNH:   Landfill Truck Traffic Subject Of Bethlehem Hearing


InDepthNH:  DES Attempts To Connect With Public:  Link

Concord Monitor:  My Turn:  Knocking on DES' Door by Sarah Doucette 9/15/21

Bringing You Up To Speed:  Cal-Rec LTE from Jon Swan 9/13/21

Conservation Law Foundation Letter To NHDES  September 10, 2021

BCM Environmental Letter To NHDES 9/13/21

From InDepthNH:  Casella Protesters:  We're Not Going To Take It

Front Page, Union Leader:  Protesters Urge State Regulators To Reject Permit For Dalton Landfill

Video of September 10, 2021 "Do The Right Thing, DES" Protest/Rally:  Click Here


On August 26, 2021 NHDES wrote to wetlands permit applicant Casella Waste Systems, asking for an "amended" permit application, to be submitted at a later date, thereby circumventing RSA 482 -A:3 XIV(a)(5), which requires an approval or denial of the wetlands permit application, within 45 days following the closing of the record, which WAS scheduled for September 13, 2021.  


From the notice of the extension of the public comment period:

"Prior to closing the public hearing, the Presiding Officer announced that, with the consent of the Applicant, the public comment period would be extended until September 13, 2021. Pursuant to RSA 482-A:3 XIV(a)(5), the Department will act on the application within 45 days following closure of the hearing record."


Per RSA 482-A:3 XIV(a)(5) Where the department has held a public hearing on an application filed under this chapter, within 45 days following the closure of the hearing record, approve the application in whole or in part, and issue a permit OR deny the application and issue written findings in support of the denial.  

(NHDES is NOT going to do that now, due to their request for an amended application.  We are owed a yes or no decision on the application as submitted!)


Please write to NHDES and demand that they follow the law and render a decision on the SUBMITTED and HEARD wetlands permit application, as per state RSA 482-A:3 XIV(a)(5), due  by October 28, 2021.  

You can send your comments to: 

david.a.price@des.nh.gov 

stefanie.m.giallongo@des.nh.gov

Cc: wetlandsapplicationpubliccomments@des.nh.gov

        rene.j.pelletier@des.nh.gov

RE: NHDES File Number: 2020-02239

 

New Hampshire Attorney General John Formella's Email To Me and My Response April 3, 2021

(Is the AG's office covering for NHDES collusion with Casella?)


Blog Post:  Collusion at NHDES (& NHDOJ)?

“we didn’t want to approve that full impact.” 

“the department was not going to approve what the company deemed to be all three phases” 

Quotes from Rene Pelletier of NHDES, Caledonian-Record 9/4/21

Caledonian-Record 9/4/21:   State Requests That Casella Amend Landfill Wetlands Permit Application

  

InDepthNH News Report 8/31/21:   State Seeks Amendment To Casella Wetlands Application

From New Hampshire Bulletin 9/1/21:  Casella requests extension on Dalton landfill permitting process as opponents work on new bill


Also, please JOIN US at 2PM on Friday, September 10 for a PROTEST in front of the NHDES building at 29 Hazen Drive in Concord, NH. Please make a sign asking NHDES to do the right thing, follow the law, and issue a decision on the permit application in accordance with state RSA.  There will be a short press conference at 2:30PM.

Video from protest:  Click Here


Link to NHDES Letter to Casella, August 26:  Click Here

Link to Casella Response Letter, August 27:  Click Here


If permitted, this 2nd North Country landfill will have the following impacts (that we know of) on the environment, tourism, safety, and quality of life on a regional level:  

Forest Lake Landfill Info Sheet:  Click Here


To date, Casella has still NOT sought ANY local approvals for this project (zoning AND lot line)


Town of Dalton Select Board letter of July 6, 2021 to NHDES Wetlands Bureau, urging suspension of permit process until local approvals are met:  Click Here


Town of Dalton Select Board letter of August 12, 2021 to NHDES Waste Management, clarifying local permitting status (Casella refuses to seek local approval):  Click Here


 CASELLA'S DESTRUCTIVE APPLICATION SHREDDED AT PUBLIC HEARING On July 14, 2021 

 Over 300 Attend Hearing, 150 Rally Before Hearing In Opposition To Wetlands Permit 


North Country Residents Urge State To Deny Landfill Wetlands Permit

by Robert Blechl, Caledonian Record


Some excerpts:


"Citing wetlands scientist and Antioch University professor Rick Van de Poll, Tucker said Van de Poll characterizes the proposed project as “perhaps one of the worst potential environmental disasters in the Granite State in recent memory.”  Van de Poll said no comprehensive wetlands evaluation or wildlife habitat impact studies have been completed and the project would permanently impact “seven times more wetlands than the failed Northern Pass proposal.”'


...To DES, Jon Swan, Dalton resident and founder of Save Forest Lake, said, “I’m a firm believer that a company’s past performance should serve as a precursor of things to come … Based on my findings, this applicant has been involved in 64 lawsuits, cited for 42 environmental and operational violations, paid over $9.25 million in fines and settlements, and has been involved in 16 accidents and deaths.” 

(Click Here For PDF of Casella Lawsuits, Violations, and Fines)


Click Here For Full Article


Other News Reports:  

Union Leader:   Protest precedes hearing on wetlands permit for Dalton landfill 

NH Bulletin Story:   Public hearing on proposed Dalton landfill draws a crowd in opposition

NHPR Story:    Protesters Rally Against Proposed Casella Landfill At Wetlands Permit Hearing In North Country

Boston Globe:   As landfill space dwindles in Massachusetts, New Hampshire has become the state’s dumping ground 

Coos Democrat:  NHDES Urged To Reject Landfill Permit


Video of Public Hearing:  https://youtu.be/G9qesGL0in4

Video of Rally:  https://youtu.be/l-WjUX-HHjE

PDF Compilation of Casella Lawsuits, Violations, and Fines:  Click Here


Links to the 397-page Wetlands Permit Application (Aug 2020) and other docs 

(DES now has 2 different sites, for some reason):  

Original:  Link to docs

New:    Link   to docs

NHDES admits consulting with NH Attorney General about violating RSA 482-A:3 XIV(a)(5)

Blog Posts Updating You About The LANDFILL Development

Please Help Us To Stop The Landfill!

Where will North Country trash go when Casella is gone?

The Mt. Carberry Landfill

Located Outside of Berlin, NH

Located Outside of Berlin, NH

The AVRRDD Mt. Carberry Landfill just outside of Berlin, NH in the unincorporated Town of Success, NH in Coos Country 

Located Outside of Berlin, NH

Located Outside of Berlin, NH

Located Outside of Berlin, NH

 The Androscoggin Valley Regional Refuse Disposal  District is the only solid waste district in the state that owns and  operates its own commercial landfill

No More Out-Of-State Waste

Located Outside of Berlin, NH

No More Out-Of-State Waste

Since the Mt. Carberry Landfill is  municipally-owned, they don't have a fleet of trucks hauling waste from outside of the North Country

No More Red MBI Trucks!

Lower Tipping Fees Than NCES!

No More Out-Of-State Waste

When NCES closes and Casella is stopped in Dalton, there will not be any more of those dirty, ugly MBI trucks roaring thru the Notch!

#SaveForestLake

#StopNorthernTrash

They Have Plenty of Capacity

Lower Tipping Fees Than NCES!

Lower Tipping Fees Than NCES!

The Phase III Expansion has not even begun, with permitted capacity life expectancy to last until 2049  and by working to reduce what we waste, we can protect precious landfill capacity for NH waste, not out-of-state!

Lower Tipping Fees Than NCES!

Lower Tipping Fees Than NCES!

Lower Tipping Fees Than NCES!

December 10, 2019 News Article In Which Executive Director Sharon Gauthier discusses acceptance of waste from other North Country towns.  Dalton made the switch in June, 2020 and saved money due to lower tipping fees!

Will Accept North Country Waste

Will Accept North Country Waste

Will Accept North Country Waste

Interview with Berlin Mayor and AVRRDD Board Member Paul Grenier discussing the closure of NCES and acceptance of North Country waste from a 2020 news article

North Country Service Area

Will Accept North Country Waste

Will Accept North Country Waste

When people ask "where is our trash going to go?" you can tell them to Mt. Carberry.  it already exists, so the North Country does NOT need a NEW landfill at Forest Lake!

Videos Concerning The Landfill Project At Forest Lake

Video from the "Do The Right Thing" Protest/Rally at NHDES in Concord, NH September 10, 2021

5+ hour video of the public hearing held by NHDES Wetlands Bureau for the wetlands permit application for the landfill project next to Forest Lake State Park. There were 59 speakers, with overwhelming opposition to the permit, with folks strongly urging NHDES to DENY the permit. As you will see, there were 5 pro-Casella shills who provided some bizarre, incoherent commentary and who seemingly forgot that the Town of Dalton has now voted TWICE to extend emergency zoning and defeated a pro-Casella warrant article. Same faces, too...which begs the question, how much is Casella paying these people? Great commentary from the 54 folks who spoke out against the permit, and as you will see, Casella reps sat in the front row as their operational and engineering expertise was called into question, along with their reputation and controversial environmental record.

Approximately 150 opponents to the proposed landfill development project next to Forest Lake State Park attended a rally July 14, 2021 prior to the public hearing for the wetlands permit application for the project. The North Country does not want, nor need, this dangerously-sited industrial development as NH has plenty of existing and future landfill capacity, especially for NH waste. Casella needs a new landfill in order to continue to profit from the importation of out-of-state waste into our borders. No thanks! Do The Right Thing DES...DENY!

Casella Engineer Joe Gay Heckled During DES Wetlands Application Permit Hearing 7/14/21

We Don't Need A Time Machine To Save Forest Lake!

Video from the House floor, April 9, 2021 relative to the effort to overturn the ITL on HB177 and get it passed, with amendment. Great effort by numerous state reps from all over to protect our great NH State Parks from the before-unseen threat of siting a garbage landfill next to one. Who does that? HB177 will make sure this does not happen again, at any one of our 68 NH State Parks.

News Story:  Landfill Buffer Bill Passes House, Moves To Senate 

HB 177 Had Wild Ride Before Getting Out Of House 

by Robert Blechl rblechl@caledonian-record.com 4/13/21 

Video From NCABC On Threat To The North Country

Short video from North Country Alliance For Balanced Change on the threat to Forest Lake State Park posed by Casella Waste Systems and their adjacent landfill development.  Together, we can stop this!  We NEED your help!

Jack Dalton aka Kid Conservationist Visits Forest Lake

 
Kid Conservationist:  Did you know that one of the first ten state parks in New Hampshire may become neighbors to a landfill?  

Family and Forest Lake

 AnnMarie Rigazio Tower of Whitefield and  a few family members at their home on Forest Lake in Whitefield, NH  discuss their family's experiences on the lake and how important it is to their family.   

4th of July Boat Parade

 Video of the Forest Lake Boat Parade, July 4, 2020 at Forest Lake State Park in the lovely North Country of New Hampshire.  It was a beautiful day, lots of great boat entries,  some footage of the lake itself, and the crowded public beach at the Forest Lake State Park.    All of this is under threat from a proposed 500+ acre landfill development adjacent to the state park and only 1/4 of a mile from the lake itself.  What could possibly go wrong? 

We Did It! WMUR July 30, 2019 Zoning Vote Victory!

 A sweet victory over Casella Waste Systems and its pro-landfill  surrogates as the citizens of Dalton voted 154-129 to empower Dalton  with Emergency Temporary Zoning in an effort to stop an unwanted, and  unneeded, 1279 acre garbage landfill development next to Forest Lake  State Park and only 2800 feet from the waters edge of Forest Lake.   What could go wrong with that silly idea? 

July 23 2019 Zoning Public Hearing Compilation

 2 news segments, 6pm and 11pm July 23, 2019 from WMUR relative to the  public hearing on Emergency Temporary Zoning in Dalton.  An unpopular,  but necessary effort to try and stop the proposed 1279 acre landfill  development only 2800 feet from Forest Lake and175 feet from the State  Park boundary. 

Leachate Spill Under Investigation At Bethlehem Landfill

Could Be Largest In N.H.

**Be sure to check out our files sections for the latest documents relative to the leachate spill and permit violations at the NCES Landfill in bethlehem, owned and operated by Casella


September 19, 2021 Save Forest Lake Press Release:  NH OPLC Investigating Casella Engineer GAY


*Update:   NHDES Cites Casella/NCES For Operating Deficiency – Leachate Release (May 1 - 3, 2021) 

Link to 7/21/21 Letter:  Click Here


More News Reports As NHDES Cites Casella For Deficiencies & Violations At NCES:

Cal-Rec:  NHDES Administrative Order Issued For Permit Violations

InDepthNH:  Bethlehem Landfill Cited for Operational Deficiencies

Cal-Rec:  Casella Slapped With "Operational Deficiency" For Leachate Spill

NHPR:  State Says Casella Fell Short On Preventing Major Landfill Leachate Spill


Link to NHDES Administrative Order For Permit Violations Due To Filling Outside Of Permitted Boundaries (7/16/21)  24,000 TONS of trash buried OUTSIDE of permitted area!


As reported by NHPR:


"The state is investigating what may be its largest-ever spill of  leachate from a landfill –the North Country Environmental Services  facility in Bethlehem, owned by Vermont waste company Casella.

The state says the incident began late on May 1, a Friday, and lasted until the following Monday.

Operators  arrived to find that a leachate tank had been overflowing all weekend,  spilling as much as 154,000 gallons of what’s often called “garbage  juice.”'  Link To Article

 

Follow up docs uploaded by NHDES to OneStop May 25, 2021, complete reports and photos, from NHDES are uploaded at the links below:  

According to NHDES's Jaime Colby:


On May 3, NCES explained that
o UST (Underground storage tank) A and UST B are each approximately 30,000 gallons

o UST A pumps to UST B, until UST B is full; then UST B pumps to the AST (Above ground storage tank, approx. 150,0000 gal)

o When the AST, UST B, and UST A are full, a signal is sent to all facility pumps to stop pumping NCES thinks that sometime over the weekend, all the tanks filled and Stage 4, Phase II continued to pump to the tanks

o Stage 4, Phase II pump communication is via a wireless radio signal, while the other pumps at the facility are hardwired

o NCES stated that it has been having difficulty with the wireless radio signal, and had been troubleshooting it for several weeks
(NCES estimated 4 to 6 weeks), and that an electrician had been in the prior week (week of April 26) to replace a part; NCES stated that it was not aware that the issue had not been fixed by the work

o NCES estimated that 500-600 gallons of leachate were released, but wasn’t sure; generally estimated less than 1,000 gallons released

o NCES observed that it appeared the leachate rose in the tanks, overflowed into manways, and ultimately discharged into the storwmater pond through old infrastructure that is no longer used by NCES but that is still in place


Thursday, May 6, 2021
On May 6, 2021, I called Joe Gay at about 10:15 AM to schedule a site visit for Monday, May 10, 2021. I also requested that the incident report include the total capacity of the leachate system (e.g., storage tanks) and an explanation or discussion of why the tanks may have been near full before the weekend.

May 10 site visit report, with photos:
 https://img1.wsimg.com/blobby/go/3a99e672-2796-498c-8250-9aae47365deb/downloads/May%2010%202021%20DES%20Site%20visit%20with%20pictures.pdf?ver=1621975339251

May 11 file report:  https://img1.wsimg.com/blobby/go/3a99e672-2796-498c-8250-9aae47365deb/downloads/May%2011%202021%20James%20ORourke%20file%20for%20comms%20of%20Ma.pdf?ver=1621975339251

May 20 file report:  https://img1.wsimg.com/blobby/go/3a99e672-2796-498c-8250-9aae47365deb/downloads/May%2020%20Jamie%20Colby%20comms%20May%203%20with%20Casella%20fo.pdf?ver=1621975339251


May 26-27 "Leachate Management Audit" Reveals 13 "Findings":  Link To 7-Page Report

NH House Votes To Pass HB177! NH Senate Kills HB177, 14-8!

HB177 Killed In NH Senate 14-8, Revived By House, Killed Again By Senators Gray & Avard

Cal-Rec Story:   Landfill Buffer Bill Finally Killed For Good


NH Bulletin:  Lawmakers Scrap Landfill Buffer Bill


New Hampshire Landfill-State Parks Buffer Bill Back From Dead, Again

Link:  Click Here


 Casella's Kevin Roy shamelessly lobbies the Town of Plymouth Select Board for help to defeat HB177...and gets handed his hat!  5/10/21   Video:  Click Here


5/11/21:  InDepthNH News Report:  Local Fight Over Landfill Lands Before Senate Committee


5/10/21:  HB177 was heard by the Senate "Energy and Natural Resources" committee on Monday, May 10.   Over 50 people spoke, including 9 State Reps, and the committee admitted that they have received thousands of emails!  The "sign in" sheet was 470 individuals signed in favor of the bill, 56  individuals signed in opposition, and 1 individual signed in as  neutral.    Our NH State Parks are major economic drivers and must be protected for future generations to also enjoy!  #HB177  


5/21/21    A SAD Day as N.H. Senate Votes Down Bill To Ban Landfills Near State Parks  Link Here


Link:  VIDEO OF SENATE VOTE 5/20/21 ON HB177 (THEY KILLED IT)  


May 6, 2021 News Story In Cal-Rec:  North Country Advocates Rally Senate Support For HB177


As  you know by now, HB177 passed in the House on Friday, April 9, 2021,  197-159.   This bill would create a 2-mile setback for siting a landfill  next to a  state park.  Sadly, Covid killed it last year as HB1319 before it  could reach the  Senate.  This year, despite the GOP-led  Environment/Agriculture Committee voted along party lines that the legislation  should go to the  floor as ITL, inexpedient to legislate, a bi-partisan  effort led to the overturn of the ITL and passed the bill! 

Click Here For Story On HB177 In Concord Monitor


 Link to full record for HB177 in the House:  Public Testimony

More Letters Supporting HB177 And Opposing Landfill Project

Conservation Law Foundation Support For HB177 (pdf)Download
NH Sierra Club Support For HB177 (pdf)Download
Cynthia Barrett of Milford Letter To Portsmouth Herald Editor (pdf)Download
North Country Alliance For Balanced Change Letter (pdf)Download
Nancy Morrison Of Mt Vernon Letter To Union Leader Editor (pdf)Download
Don Sharp of Dalton Letter To Caledonian Record Editor (pdf)Download
NH Forest Society Letter Support For HB177 (pdf)Download
Cliff Cayer "From Treasure To Trash, NO!" Cal Rec 4 21 21 (pdf)Download
Dr Adam Finkel Cal-Rec Letter 4 22 21 Stop Fear Mongering (pdf)Download
Littleton 2021 Town Warrant Article Petition With Signatures (pdf)Download
Littleton Business Petition Jan 11 2021 (pdf)Download
SFL Online Petition 506 Signatures with comments (pdf)Download
March 2021 Compilation Letters Of Opposition And Concerns From The North Country Towns And Environmental Organizations Relative To Landfill Project (pdf)Download
NH Native Fish Coalition Letter HB177 NH Senate May 1 2021 (pdf)Download
AMC HB177 Senate 5 10 2021 (pdf)Download

Protect Free Speech and Forest Lake From Casella

Protect Free Speech and Forest Lake From Casella

Please join me in defense of Free Speech and Forest Lake as Casella Waste Systems seeks to silence my voice and this website in the exercise of our right to Free Speech and opposition to this terrible landfill development!  Please, I hope you will add your voice to mine! 

April 21 News Story:  Counter Suit 

Thank you!

Donate Now

Powered by

Older News Relative To The "Granite State Landfill"

DES Wetlands Bureau To Hold Wetlands Permit Hearing Soon, Stay Tuned

April 7, 2021 Caledonian-Record Story:   SAU 36: School Board Hears Landfill Traffic Concerns


Feb 15, 2021 Caledonian-Record Story:  "Proposed Landfill In Dalton Triggers Lawsuit Against State"


Feb 14, 2021 NHPR Story:  "Lawsuit Aims To Block NH Landfill Permits Under Outdated Waste Plan"


Please write  to NH DES and urge them to DENY the wetlands permit at:

 To: wetlandsapplicationpubliccomments@des.nh.gov
CC: craig.rennie@des.nh.gov
Subject: Wetlands Application #2020-02239 


News Story From the Caledonian-Record (Jan 14, 2021):  

More Towns Mount Opposition To Proposed Landfill In Dalton


Also From The Caledonian-Record:

 "Although Casella representatives previously told the public that the landfill would not be visible, Rennie said it appears the finished grades of the landfill will be higher in elevation than the land’s height toward Forest Lake and the state park, and visual and aesthetic impacts must be further assessed.


For the 397-acre state park and surrounding areas that the state says play a supporting role in regional recreation, DES is asking Casella to provide in greater detail whether impacts from the project could “eliminate, depreciate or obstruct the commerce, recreation or aesthetic enjoyment of the public” as outlined under state law.


It is also not clear how “the downstream high-value Alder Brook wetland complex and ultimately the Ammonoosuc River’s water quality will be protected if treatment of landfill runoff fails or if the landfill liners develop leaks over time,” said Rennie."  Full story:  Click Here

Casella VP Brian Oliver Letter To Dalton BOS Urging HCA Negotiations

Meanwhile stonewalling on zoning application...Perhaps hoping HCA negotiations would provide credibility to NH DES for project while hoping for a zoning vote defeat in March?

The Oliver Letter 11/16/20   

Ammonoosuc River LAC (Local Advisory Committee) Notifies NHDES Wetlands Bureau of its disapproval

 "Considering factors of topography, natural resources, socio-economics, and safety, the LAC members in attendance were in accord that selection of the landfill location should be based on criteria related to the environmental and hazardous material management. It is recommended that the Dalton site selected for the new landfill does not appear to be a suitable location for multiple reasons. In addition, the Ammonoosuc River having been selected for two upstream landfill sites (existing landfill in Bethlehem and proposed site in Dalton) makes it seem like the responsibility has unduly been put on one river to carry the landfill burden, which is unfair to the downstream communities."   Full Letter To NHDES

Past Letters From Dalton & Bethlehem Conservation Commissions (Same Arguments Exist TODAY)

Dalton Conservation Commission Opposition 2008   

Bethlehem CC Opposition 2008

Bethlehem Selectmen To See If Landfill Access Violates Settlement Agreement

Small Road Poses Big Question

New Casella Mailer To Dalton Residents With Some Misleading Info And Notes From Us Regarding This

Copy of Mailer With Notes Addressing Misleading Info

NH DES Questions Casella Over NCES Capacity (We Think They Are OVER)

Copy of September 1, 2020 Letter To Casella From DES

Bethlehem Board of Selectmen Elect To Seek Legal Counsel Over Casella Expansion Into Dalton (ROW)

Click Here For Video of the September 14, 2020 Town BOS Meeting

Casella and NH DOT Meeting Minutes From January 2020

That's right, looks like 100 WB-67 Tractor Trailers will be rolling thru Whitefield!  

Click here for link to meeting minutes doc in our files section

Dalton Select Board Takes Next Step After Casella Offer

One week after Casella Waste Systems made its formal offer of $71 million over 25 years to the town of Dalton in support for a landfill beside Forest Lake State Park, selectmen took their next step — looking into the zoning question.

Since July 2019, Dalton has had temporary emergency zoning (coming out a special town meeting in 2019 in response a possible landfill), and the Board of Selectmen on Wednesday voted 3-0 to enlist the town attorney to look into the zoning application process.

https://www.laconiadailysun.com/news/state/dalton-select-board-takes-next-step-after-casella-offer/article_34d84345-2b9e-50d8-9d43-a3f091c365fa.html

Casella Makes Formal Offer To Town Proposal Worth $71 Million During 25-year Period

Representatives of Casella Waste Systems on Monday made their formal money offer to the town - one they said includes homeowner compensation for any devalued properties - in return for the town’s support of a landfill beside Forest Lake State Park.  

The company’s engineer also said permits are now being filed.  The state wetlands permit application for the privately owned commercial landfill, which, if approved, would be called the Granite State Landfill, was expected to be filed Tuesday, Sept. 1, said Casella engineer Joe Gay.

https://www.caledonianrecord.com/news/local/casella-makes-formal-offer-to-town/article_827aa73b-6173-5f2c-9b98-ebba09f8650b.html

North Country:Residents Want Status Of Casella Projects In Dalton, Bethlehem

Although no application has been submitted by Casella Waste Systems for its proposed landfill in Dalton, an official with the state environmental services department said two applications for needed permits for the project could be submitted this month.

That comes out of a July 23 remote meeting that state Rep. Andrew Bouldin, D-Manchester, at the request of several North Country residents, scheduled with representatives of the New Hampshire Department of Environmental Services, whose solid waste management director, Mike Wimsatt, fielded two dozen questions from area residents about the status of the company’s plans in Dalton and Bethlehem.

https://www.caledonianrecord.com/news/local/north-country-residents-want-status-of-casella-projects-in-dalton-bethlehem/article_ea7447f4-095b-53b0-85b5-cec63aece1a3.html

History And Testimony On Controversial Casella Waste Systems

From Old Town, Maine...Juniper Ridge Landfill 2020

Some history on the Casella operated, state-owned Juniper Ridge Landfill.   Video:  Out of State Trash into JRL and Leachate into Penobscot River 

 The Casella-run JRL has raised the ire and scrutiny of local landfill opponents and community members for nearly two decades.     Community members across Maine have tried repeatedly to show that state waste rules are not protective of environmental and human health, with  leachate being  processed and dumped into the Penobscot River. 

From Hardwick, MA

Some history on the Casella Hardwick Landfill in Hardwick, MA.  Note the impact on the town, which appears to be very similar to both Dalton and Whitefield, NH.  Is this our future?  We can work together to STOP this from happening to Dalton, Whitefield, and the North Country.  #DevastatingImpact

From Southbridge, MA

  "Now U Know', an engaging and revealing 2009 documentary about the Southbridge Landfill expansion, explores how and why a dangerous landfill expansion proposed by Casella Waste Systems, Inc. was approved by the local Board of Health despite overwhelming public opposition.    The film demonstrates that not only can a landfill of that size not be made safe, but it shows that residents do not trust Casella Waste to protect their health.  

From Bethlehem, NH

 CEO John Casella receives a green business innovator award from Vermont Law School despite trail of environmental disasters throughout New England created by Casella Waste Systems.   #GreenWashing101

From Biddeford, Maine

 News story from 2010 where The Maine Supreme Court has ruled that private citizens can sue Maine Energy Recovery Company in Biddeford, owned and operated by Casella Waste Systems.   Casella eventually sold it to Biddeford and MERC was closed for good.  #Nuisance 

Please Save Forest Lake State Park For Our Children!

The future speaks!

From the August 8, 2020 NCES protest in Bethlehem, NH...a young Mr. Sweeney

Don't Ruin It For Me

From the July 8, 2020 NCES protest in Bethlehem, NH

Water Is Life

Casella's Proposed 180 Acre Landfill Is Surrounded By Wetlands, Forest Lake and the Ammonoosuc River

  

Share YOUR Thoughts with NHDES:  

Mike Wimsatt, DES Waste Management Director, is the ultimate decision maker relative to signing off on the landfill permit! 

You can say hello to him at:  michael.wimsatt@des.nh.gov 


It’s up to all of us to safeguard our environment!   

PLEASE WRITE TO DES, YOUR LOCAL NEWSPAPERS, AND TOWN SELECT BOARDS 

AS THIS WILL IMPACT ALL OF THE NORTH COUNTRY!!


Let us know if you want a yard sign!!  

Email Jon at SaveForestLake@yahoo.com


A Pattern Of Behavior: Southbridge, MA & Bethlehem, NH...

Landfills and the Tie that Binds: Southbridge and Bethlehem

 Is Dalton, NH next?  Let's hope not!


"I have seen the name of Southbridge, MA in connection with Casella Waste Management - but I never fully appreciated how much The Town of Bethlehem has in common with The Town of Southbridge. A few seconds of research on the Internet revealed several news articles.  The one that quickly caught my attention was in the June 2017 Telegram & Gazette (telegram.com). The article details a lawsuit filed against Casella by two environmental groups and says: “The suit alleges the Southbridge landfill has been releasing toxic pollutants to groundwater for years...”


In the overview, the state director of one of the environmental groups, said Casella consistently employs "sneaky and aggressive strategies" to bully towns and expand their profits. She continued, "Casella's business strategy pattern is to enter communities with an existing trash facility and expand, expand, expand, while trying to disregard local officials and concerned residents."  


If this was not hard enough to read and so familiar, the comments by a resident affected by the pollution were just as meaningful: "When you think about how long this has been going on and the fact that Casella is still seeking to expand...It boggles my min...To me, it's proof that they are willing to put profit before people."


Herein is the strongest connection between Southbridge and Bethlehem. That the Casella corporation is described in this article in ways we in Bethlehem have already experienced should be a rude awakening for anyone “on the fence” about this company and make everyone aware of their relentlessly aggressive attempts to convince us to permit them to EXPAND the NCES landfill from 61 to 161 acres, another 100 acres for a mega-dump!


The Casella corporation has some in town believing that a landfill expansion will save us from financial ruin. The fact is our property taxes have already risen – despite Casella dumping TONS of trash from multiple STATES here for YEARS!


That same article about Southbridge describes how contaminants – one a “probable human carcinogen 1,4-dioxane” – have been discovered in “drinking water aquifers and residential drinking wells.”  Casella denies responsibility, of course, but another article (February 2017) reported that the Mass. Dept. of Environmental Protection “named Casella as the potential responsible party and directed the company to supply bottled water or whole-house filtration systems to the affected homes.”  


Bethlehem has spent tens of thousands of dollars in legal fees FIGHTING Casella over the past 20 years and we continue to add legal fees to the budget because of Casella, most recently because they may file for an abatement to decrease their taxes.  These legal fees increase our property taxes. 


The NCES landfill is on Trudeau Road in Bethlehem, but during the day the mound of trash can easily be seen from Route 302 in both directions, and at night you can see the flame from the torch burning off the gases being released from the trash. This eye sore is a heartbreaking blemish on the beautiful backdrop of our White Mountains!


The Southbridge landfill and its history goes back to before Casella became involved, but once they were – their business model only added  to the woes that face this town today – and what could very well be the future of the NCES/Casella landfill here.

We must say no to any future landfill expansions."


Nancy Dickowski, Bethlehem 

(THANKS to Build A Better Bethlehem for allowing us to use Nancy's commentary! )

To read even more warnings from Bethlehem and Southbridge residents, click here.  

More On Casella Waste Systems

Additional News Stories About Controversial Casella Waste Systems

More info located in our "Files" sections as there is so much data about this controversial company! 


New Hampshire State Parks Director REJECTS Casella "offer" of financial assistance for Forest Lake 


Casella Attorney Tries To To Open Up Back Room Talks With Dalton:  Selectboard Says NO


Mainers try to close loophole on out of state waste:  Casella has long taken advantage of


Casella's Controversial History in Hardwick, MA:  23 Minute Video Details Dramatic Impact on town


A not so flattering look at Casella Waste Systems in Bethlehem, NH:  2009 YouTube Video John Casella Gets Green Award And Questioned About Bethlehem


From 2005, A Detailed Report On Controversial Casella:  Coming To A Community Near You?


Casella's controversial history in Maine:     I would rather shake hands with a rattlesnake 


Casella tries to take advantage of Covid-19 crisis in VT:  Seeks Delay Of July 1 Food Waste Ban


More bad news for Casella-operated landfill in the Finger Lakes of New York state:  

Casella Gets New Violation Notice For Odors

Not Much Has Changed In Six Years:  Odor Complaints In The News 2014


Class-Action Lawsuit Filed By Over 1000 Plaintiffs In NY v Casella Over Odor, Declining Property Values

Click Here For Story And Court Docs


High readings for PFAS found in Montpelier and Newport VT wastewater plants:

The 2 plants cited  regularly accept landfill leachate from Casella landfill


Video of Casella CEO John Casella at Jan 2020 Newport Meeting on landfill leachate:

Casella:  "The science says there is no health risk to humans or to the environment" (from PFAS)


Casella’s interest is their bottom line, not their community:

A response to ‘Why weren’t we in the room?’


Casella CEO  John Casella Wants To Give Town of Dalton $50K-$100K: 

Landfill Opponent Files Complaint Of “Influence Peddling” With NHAG


Coventry, VT Landfill Tanker Crash Causes Contaminant Spill  

Early Morning Accident  Spill Of 8000 Gallons  Near Black River


Casella  Greed On Full Display At Hakes NY Landfill: 

Little Concern Shown As Plaintiffs Sue Over Radioactive Fracking Waste

 

Casella Bypasses Maine Law Prohibiting Out Of State Trash:

Juniper Ridge Landfill To Receive More Toxic Sludge


Casella CASHING IN On Recycling Crisis It Helped To Create (Westbrook, ME Story)

Note High Contamination Rate For "Zero-Sort" Recycling (40-60% Contamination)


Casella in Potsdam, NY:  Waste Stream Inc. SuperFund Site Remediation (Tax Abatement Sought):

 Village left with contaminated wetlands and “a whole bunch of worthless property.” 


Hyland Landfill Issues From Angelica, NY


Damning commentary about Casella's impact in Angelica, NY


Here's Another Website Dedicated To Casella's Bad Reputation:  Click Here 


Oh, but wait, here's another!  Warnings from Bethlehem and Southbridge residents about Casella

NH DES photo showing violation for inadequate ground cover at Casella landfill in Bethlehem, NH

 

State Presses Casella On PFAS, Dioxane Contamination At Bethlehem Landfill

Look For Us On Social Media

Help Us Save Forest Lake

Thank you for donating!  

We have yard and 8x11 signs if you'd like one for your yard or business!

Your support and contributions will help continue to fund our mission.

Your donations help to keep this site up and running, thank you!


Pay with PayPal or a debit/credit card

Copyright © 2018 Save Forest Lake - All Rights Reserved.

Powered by GoDaddy